December 2017

Associated Underwater Services was subcontracted to assist Cannon Builders with the removal of piles for the Loveridge bridge the Snake River in Idaho. AUS cut 85 concrete filled steel piles at or below the mudline, then loaded them onto a barge for disposal.

snake river