Twin Falls Powerhouse
August 2013 AUS conducted a survey of the Twin Falls Powerhouse tail race tunnel between August 6 and August 8,2013. The condition of the tunnel was documented by ROV video and scanning and imaging sonars. After analysis of the information provided by the survey, thetunnel was found to be in good condition with no significant