Projects

Wells Dam Draft Tube Cable Replacement

2021-04-27T20:27:21+00:00April 27th, 2021|Projects|

Wells Dam, Douglas County PUD – Draft Tube Cable Replacement AUS was contracted to replace the Draft Tube Gate Cables in Unit 3. This work entails the entire dive crew and the PUD Maintenance Crew working under pressure in the Draft Tube Gallery. The gate connection is underwater and the gate hoists are

Cabinet Gorge Dam Fish Passage Project

2021-04-27T20:18:30+00:00April 27th, 2021|Projects|

Cabinet Gorge Dam, AVISTA Utilities – Fish Passage Project AUS was contracted to provide the underwater support to construct a dewatering structure so that the fish passage facility could be built in the dry. Divers performed the following tasks during the project: Drill and install anchor bolts to secure

Thompson Falls Dam Spillway Gate Rebuild

2021-04-27T20:00:03+00:00April 27th, 2021|Projects|

Thompson Falls Dam, Northwestern Energy – Spillway Gate Rebuild AUS was contracted to install and seal stoplogs to dewater the spillway gate. This allowed for maintenance, repairs, and painting to be performed on the gate in the dry. AUS removed the dewatering structure after the gate work was completed.

Long Lake HED Plant Upgrade – Sonar Services

2020-10-07T22:16:37+00:00October 7th, 2020|Projects|

As part of the Long Lake HED Plant Upgrade Project, AUS was contracted to survey the four draft tubes and the tailrace floor. To perform the survey, AUS utilized a multi-beam sonar system for the tailrace and a Blueview 5000 3D Mechanical Scanning Sonar mounted on a tripod for the draft tubes.  Multiple images from

Remote Alaska ROV and Multibeam Survey

2020-08-27T17:28:50+00:00August 27th, 2020|Projects|

AUS was contracted to perform underwater video inspection on the remote island of Sheyma. The inspection included but not limited to, remote operated vehicle inspection of the dock facility, sonar mapping of damage and debris fields. AUS mobilized a Seaeye Falcon ROV system, Kongsberg multibeam system, echo sounder and inflatable work boat to perform the

Lady Grace Salvage

2020-06-02T14:28:58+00:00June 2nd, 2020|Projects|

The Washington State Department of Natural Resources Derelict Vessel Removal Program awarded AUS the contract to remove an 80-foot commercial fishing vessel from the Hoquiam River in Southwestern Washington.  The 90-year-old Lady Grace sank on March 2, 2018. The original plan to salvage this vessel was to lift her off the river bottom with lift

Wrangell Ferry Terminal Improvements

2020-03-07T03:01:51+00:00March 7th, 2020|Projects|

August 2013 Associated Underwater Services was subcontracted by Pacific Pile and Marine to perform underwater maintenance on the Wrangell Ferry Terminal in Wrangell, Alaska. This consisted of two phases, the first phase was an ROV inspection to identify problem areas at the terminal. The second phase was to address the areas exhibiting the most wear.