Projects

Lady Grace Salvage

2020-06-02T14:28:58+00:00June 2nd, 2020|Projects|

The Washington State Department of Natural Resources Derelict Vessel Removal Program awarded AUS the contract to remove an 80-foot commercial fishing vessel from the Hoquiam River in Southwestern Washington.  The 90-year-old Lady Grace sank on March 2, 2018. The original plan to salvage this vessel was to lift her off the river bottom with lift

Wrangell Ferry Terminal Improvements

2020-03-07T03:01:51+00:00March 7th, 2020|Projects|

August 2013 Associated Underwater Services was subcontracted by Pacific Pile and Marine to perform underwater maintenance on the Wrangell Ferry Terminal in Wrangell, Alaska. This consisted of two phases, the first phase was an ROV inspection to identify problem areas at the terminal. The second phase was to address the areas exhibiting the most wear.

Boundary Dam Crack Repair

2021-01-13T23:00:16+00:00March 7th, 2020|Projects|

October 2019 Associated Underwater Services was contracted through a Master Services Agreement with Seattle City Light to repair a crack that AUS divers had previously discovered during an inspection at Boundary Dam. AUS divers repaired a crack that was approximately 50’ long X 1/8” wide. The crack was on the Vertical Face, partially on the

Southway Access Boat Launch Inspection

2020-03-07T02:57:00+00:00March 7th, 2020|Projects|

December 2019 AUS was contracted to perform an inspection on the Southway Access Boat Ramp in Lewiston, Idaho. The purpose of this inspection was to identify the overall condition of the boat ramp and to locate any areas that needed to be addressed. AUS divers mapped out the ramp noting any areas that were tapered

Central Premix Clamshell Recovery

2020-03-07T02:55:18+00:00March 7th, 2020|Projects|

January 2020 Central Premix operates their cranes in the Spokane Aquafer 16 hours per day to remove gravel from the aquafer to use in their cement mixture. One of the Clamshell buckets on a crane had become inoperable and stuck in the Aquafer. AUS was called in to investigate the situation and deployed a VLBV

181B Wetwell Bulkhead Replacement

2023-12-27T21:55:26+00:00March 7th, 2020|Projects|

January 2020 AUS was subcontracted to perform the diving portion of the 181B Wetwell Bulkhead replacement. Upon removing the trashracks, AUS divers discovered concrete overpour which had to be removed using a rock drill. The divers then cleaned and inspected the Wheelabrator Screen using a pressure washer. When the divers made it to the