AUS Completes Hydrographic Survey and Intake Tunnel Debris Removal at Diablo Dam

2022-11-15T20:48:23+00:00November 15th, 2022|News, Projects|

AUS was deployed for an emergency call out to survey concrete and debris inside the intake structure for the turbines at Diablo Dam. Utilizing an 8-man crew, AUS removed concrete debris from inside the intake tunnel, downstream from the trash racks, at depths of 120’ – 150’. AUS completed a hydrographic survey to inspect the